Overview
A mid-market confectionery producer acquired by a PE sponsor with a margin-expansion thesis.
Challenge
Legacy on-prem ERP with no actual costing. The sponsor needed SKU-level margin within the first 100 days.
Solution
What we configured
- Production BOMs & routings
- Standard and actual costing
- Lot tracking & shelf life
Extensions used
Production Cost AnalyzerInventory Insights
How AI was used: AI drafted 1,400 BOMs from recipe spreadsheets; the team reviewed exceptions only.