Skip to content
← All customers
Business CentralManufacturingPE portfolio

PE-backed confectionery manufacturer gets real-time cost visibility on Business Central

[CONFIRM: 8 wks]

to go-live

Overview

A mid-market confectionery producer acquired by a PE sponsor with a margin-expansion thesis.

Challenge

Legacy on-prem ERP with no actual costing. The sponsor needed SKU-level margin within the first 100 days.

Solution

What we configured

  • Production BOMs & routings
  • Standard and actual costing
  • Lot tracking & shelf life

Extensions used

Production Cost AnalyzerInventory Insights

How AI was used: AI drafted 1,400 BOMs from recipe spreadsheets; the team reviewed exceptions only.

Want results like these?

Thirty minutes. A fixed-fee proposal within 48 hours.